Before the works...
In this Stevenage property we installed approx. 60 sqm sqm of oak solid wood flooring. During our free survey, we did a thorough inspection of the floors and discussed with the client all possible options.
Our client has decided to go for floor fitting, subfloor preparation, beading installation, and install with solid oak scotia beading around perimeter.
How the floor installation was completed...
One of the challenges we faced on this project is to complete the floor works in stages, due to furniture, which could not be moved out.
After our floor installers have checked all service, property & products details on site, including amount of products supply, they started with lifting existing hardwood flooring and its preparation for disposal to our waste facility.
in this flooring project we laid 60 sqm of solid wood flooring, with glue-down installation, over concrete subfloors.
Due to the change of level, after the new flooring was installed - our experienced, local Stevenage floor fitters made sure all affected doors & door frames are trimmed to height and adjusted to new flooring.
Overall the project was completed as scheduled and to the satisfaction of the client.